Perspective Shot

Perspective week 50

The photos below (clockwise) show the entrance near the gym, the front entrance with the upper window complete, the playing fields and the back of the school and the temporary sign welcoming people.  The fence posts were installed this week as well as continued work on landscaping to prepare for play structures, playing fields and the parking lot.

back entrance wk50_frontwindow

pict00031 pict00042

Inside the school things are nearing completion.  The cupboards, floors, blackboards, ceilings and lights are installed.  There is still some painting and cleaning to be done by volunteers over the next week.

Kitchen pict00062

Above left is a photo of the kitchen and the photo above right shows the reception area.  Below are some classrooms.

classroom pict0010

pict0009 pict0007

The photos below show the unique activity rooms that are located between classrooms to facilitate activities such as small group work and volunteers working with students.

pict0012 pict0008