Once again there was a flurry of activity on site as the construction team worked on the electrical work and ceilings.  The parking lot is being prepped for paving.  Many volunteers were at the school in the last two weeks hanging up cabinetry and painting.  Everything is going smoothly and looking great!

Library wk45computerwire

The picture above left shows the library which is filled with boxes of ceiling tiles waiting to be installed.  Above right shows some volunteers installing computer cable.

Many staff were at the new school this past weekend helping to get the classrooms painted.  Beware!  Mr.Stassen was hiding subliminal messages such as ”study hard” and “I love to learn” as he painted the walls!

wk45speyers wk45spiers wk45morepainting

wk45painting wk45gordon

Gordon takes a break from the painting to walk around and  do some “quality control.”